A ring main unit is a compromise between three things that do not naturally fit together: a sealed, compact enclosure, a busbar system rated for the full fault level, and instrument transformers that must measure to revenue accuracy inside that same enclosure. The CTs and VTs are usually the last components designed in and the first to be blamed when metering drifts or a compartment runs hot.

This note looks at what a 24–35 kV ring-main cubicle actually demands from its instrument transformers, using the ratings we build every day: single-phase, phase-to-earth voltage transformers with a residual winding, and epoxy-cast current transformers sized for KYN28-class panels and compact ring-main enclosures.

  • An RMU voltage transformer is almost always single-phase, phase-to-earth: 35/√3 kV or 24/√3 kV primary, 0.1/√3 kV secondary, plus a 0.1/3 kV residual winding for earth-fault detection.
  • Insulation coordination follows the enclosure, not the busbar current: BIL 185 kV at 36 kV equipment, BIL 125 kV at 24 kV.
  • The limiting design case is usually heat in a sealed compartment, not dielectric strength — a CT rated 600 A in open air may need derating once it shares a small tank with a busbar.
  • Accuracy class is only meaningful with a burden: class 0.5 at 10 VA and class 0.5 at 30 VA are different products.

1. Why the phase-to-earth transformer dominates RMU metering

Most ring-main units are operated with an earthed neutral, either solidly or through a resistor. That single fact decides the winding arrangement: the voltage transformer is connected phase to earth, so its primary is rated at Um/√3 — 35/√3 kV for a 36 kV system, 24/√3 kV for 24 kV, 10/√3 kV for 12 kV.

A phase-to-phase VT would need two phases brought into the same small compartment and would still say nothing about the neutral. The phase-to-earth unit gives the phase voltage directly, and — because it carries a second, low-voltage winding connected in open delta — it also gives the displacement voltage 3U0 that every earth-fault relay in the network depends on.

Typical nameplate for a 35 kV RMU unit:

ParameterRatingWhy it matters
Rated primary voltage35/√3 kV (or 24/√3 kV)Must match the system's phase-to-earth voltage, not the line voltage
Rated secondary voltage0.1/√3 kV (100/√3 V)Standard meter and relay input
Residual winding0.1/3 kV (100/3 V per phase)Open delta → 3U0 for earth-fault protection
Accuracy class0.2 / 0.5 for metering, 3P for protectionRevenue vs. indication vs. relay duty
Rated burden15–50 VA depending on classClass is only guaranteed inside the burden window
Voltage factor1.2 continuous / 1.9 for 8 h (unearthed systems)Earth fault raises healthy-phase voltage by √3
Insulation level36 kV: 70/170 kV or 185 kV BIL depending on specificationFollow the switchgear's insulation coordination

2. The residual winding is not optional

In an earthed system, a single-phase-to-earth fault produces a small neutral displacement and a comparatively small 3U0. In an isolated or resonant-earthed system the same fault produces a large displacement that persists until the fault is found — which can be hours. The residual winding is what makes that visible.

Two design choices follow from it. First, the residual winding must be rated for the continuous voltage it will see during a persistent fault, which is why the voltage factor appears on the nameplate as a pair: 1.2 continuous, and either 1.9/30 s or 1.9/8 h. Second, the residual winding's own accuracy class (usually 3P or 6P) is deliberately coarse — it exists to detect a fault, not to bill for one.

Specifiers sometimes ask for a 0.2 class residual winding. It is manufacturable, but it buys nothing: the relay only needs to know that 3U0 exceeded a threshold.

3. The CT side: ratio, class, and where the burden goes

Ring-main CTs are cable- or busbar-through units, typically 200/5 A to 600/5 A, with one metering core and one or two protection cores. The metering core is usually 0.5 or 0.2S; the protection core 5P10 or 5P20.

The most common specification error is not the ratio — it is the burden. A 0.5 class core at 5 VA is a small, cheap core. The same 0.5 class at 30 VA needs more iron and more copper, and costs noticeably more. If the meter, the terminal block and 2.5 mm² wiring add up to 12 VA, a 5 VA core will drift outside its class long before it fails.

  • Add up the meter burden, the relay burden and the lead burden (I²R of the run, both directions).
  • Keep the connected burden between 25 % and 100 % of rated VA — below 25 % the core is under-exercised and the error curve flattens unpredictably.
  • If the runs are long, calculate before you specify; the arithmetic is in our CT burden guide.

4. Heat is the real constraint in a sealed cubicle

An RMU enclosure is a small volume with a large current-carrying busbar inside it. The instrument transformers sit in that volume and are heated from two directions: their own losses and the ambient rise produced by everything else.

Published thermal studies of ring-main enclosures show exactly this behaviour — the temperature rise at the instrument-transformer position is driven by the busbar current and by the enclosure's ability to convect, and the hottest points are not where a simple hand calculation would put them. Simulation work on RMU temperature rise is now common precisely because the measurement is expensive to do on every design variant.

For the transformer itself, the practical consequences are:

  • Insulation class: cast-resin units are normally class B (130 °C) or class F (155 °C); the limiting component is usually the epoxy, not the copper.
  • Derating: a CT continuously loaded above its rated current in a 55 °C ambient will run hotter than the same CT in a 40 °C ambient; specify the ambient, not just the current.
  • Mounting: a unit bolted to a hot busbar conducts heat through its primary conductor. Thermal isolation is rarely possible inside an RMU, so the rating must include the effect.

5. Fitting the unit into the cubicle

Three mechanical numbers decide whether a transformer fits: phase spacing, the distance from the busbar to the cable compartment, and the height available above the cable box. A 35 kV unit is roughly 200–250 mm across the sheds and 300–400 mm tall; at 24 kV the same design shrinks by a third.

The reason we keep primary terminals short and axially aligned is that RMU cubicles rarely allow a primary adapter. A unit that needs an extra 60 mm of clearance is a unit that will not go in. This is also why the KYN28 panel — a much larger envelope — accepts the same transformer with no modification: the constraint is the small enclosure, and the large one is generous.

6. A datasheet that can actually be built

Most disputes at the factory gate trace back to a datasheet that specified a class without a burden, a voltage without a factor, or an insulation level without a reference standard. The following line specifies a 35 kV RMU voltage transformer completely:

VT, single-phase, 35/√3 kV / 0.1/√3 kV / 0.1/3 kV, class 0.2 at 30 VA (metering) and 3P at 50 VA (residual), rated voltage factor 1.2/1.9/8 h, insulation 36/70/170 kV, ≤5 pC at 1.2 Um, IEC 61869-3, indoor, cast epoxy, KYN28 mounting.

7. Frequently asked questions

Can one VT serve both metering and protection?

Yes, if it has two secondary windings — one metering core and one protection core. A single core cannot be both 0.2 and 3P: the accuracy requirements are contradictory, and the protection core needs a much larger saturation margin.

Why 35/√3 kV rather than 35 kV?

Because the transformer is connected phase to earth. The line-to-line voltage of a 35 kV system appears across two phases; each phase sits at 35/√3 kV relative to earth, and that is the voltage the primary winding sees.

What happens if the residual winding is left open?

Nothing at all — that is its normal operating state. The winding is connected in open delta, so no current flows until a phase-to-earth fault creates a displacement voltage. Leaving it open is correct; shorting it is not.

Does the CT ratio have to match the busbar rating?

No. The ratio is chosen from the load current and the metering range, not from the busbar's fault rating. A 630 A busbar may carry 200 A of normal load, and a 200/5 A CT will meter that far better than a 600/5 A unit.

8. References and further reading

  1. Comparative Study of Simulation of Temperature Rise in Ring Main Unit, JoVE (Journal of Visualized Experiments) — thermal simulation of RMU enclosures. jove.com
  2. Non-Conventional Instrument Transformers: State of the Art, IEEE Access — review of voltage and current sensing technologies for MV and HV switchgear. IEEE Xplore
  3. IEC 62271-200, AC metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV.
  4. IEC 61869-2, Instrument transformers — Part 2: Additional requirements for current transformers; IEC 61869-3, Part 3: Additional requirements for inductive voltage transformers.

Looking for a phase-to-earth VT or a cable-through CT that fits a specific RMU cubicle? Our voltage transformer range and current transformer range list the ratios, classes and enclosure dimensions per model — and if the combination is not listed, it is usually a winding or shed change rather than a new design.