Deep-dive technical guides written by senior high-voltage application engineers covering IEC 61869-3 standards, PT selection, ferroresonance mitigation, and accuracy class guidelines.
Two long-form engineering guides, six original diagrams and a practical planning model for the CTs and PTs between the 110 kV grid and the GPU rack.
A practical planning model for the CTs and PTs behind a 100 MW AI campus — from the 110 kV grid to the GPU rack — with count ranges, selection rules and certification notes.
A stage-by-stage guide to current and voltage transformers in an AI campus: HV connection, MV switchgear, transformer differential, UPS/ATS, PDU and the GPU rack.
The difference between a potential transformer and a current transformer: what each measures, how each is connected, and why their secondary safety rules are exact opposites.
A plain-English guide to potential transformers: what they do, the main types, where they are used, and the four numbers that matter on the nameplate.
How a potential transformer turns high voltage into a safe 100 V signal: the turns ratio, the core and windings inside, how burden affects accuracy, and the one connection rule that differs from a CT.
Learn how to specify ratio, burden and accuracy class for 10kV indoor current transformers in KYN28 switchgear, including dual-core metering and protection requirements.